FairBattery › State battery rebates › Western Australia
Western Australia battery rebate
Federal rebate plus the WA Residential Battery Scheme rebate. A 13.5 kWh battery installed in WA by 31 December 2026 gets about $4,576 to $7,440 in total: federal $3,276 to $3,640 plus $1,300 or $3,800 from the WA scheme (Synergy or Horizon Power).
What you can get in WA
| Usable kWh | Federal, by 31 Dec 2026 | WA extra | Total | Federal from 1 Jan 2027 |
|---|---|---|---|---|
| 5 | $1,224 to $1,360 | $650 or $1,900 | $1,874 to $3,260 | $1,008 to $1,120 |
| 10 | $2,448 to $2,720 | $1,300 or $3,800 | $3,748 to $6,520 | $2,052 to $2,280 |
| 13.5 | $3,276 to $3,640 | $1,300 or $3,800 | $4,576 to $7,440 | $2,736 to $3,040 |
| 20 | $4,284 to $4,760 | $1,300 or $3,800 | $5,584 to $8,560 | $3,600 to $4,000 |
| 30 | $5,544 to $6,160 | $1,300 or $3,800 | $6,844 to $9,960 | $4,644 to $5,160 |
Paid per kWh of usable capacity up to 10 kWh: up to $1,300 for Synergy customers and up to $3,800 for Horizon Power customers. You must join a virtual power plant. A loan of up to $10,000 over 10 years is available to households earning under $210,000.
WA Residential Battery Scheme
- Battery must have at least 5 kWh of usable capacity and be on the Clean Energy Council approved list and your utility's Supported Solution List.
- Joining a virtual power plant (VPP) is mandatory. Horizon Power customers must join Horizon Power's VPP.
- You must hold a Synergy or Horizon Power account for the property.
- The seller must be a New Energy Tech approved seller with a WA address, and applies on your behalf. The rebate can't be claimed after installation.
- Loan option: up to $10,000 over 10 years for households earning under $210,000.
- The scheme runs until 100,000 rebates are paid, expected to be some time in 2027.
Federal rebate rules that apply in every state
- The battery must be new, and installed as a single job.
- Battery must be on the Clean Energy Council approved battery list at the time of installation.
- Battery must be paired with a new or existing solar PV system of no more than 1 MW.
- Battery must be capable of joining a virtual power plant (grid-connected, or off-grid within 1 km of the grid).
- Installer must be Solar Accreditation Australia (SAA) accredited with a battery endorsement.
- Only one battery system per premises (per NMI for grid-connected systems).
- The battery must stay at the property until the end of its warranty or the end of 2030, whichever is later.
- The rate depends on the install date, not when you sign. Technically it's the date the battery's electrical safety compliance certificate is issued.